S/N
|
PROJECTS
|
CLEINT
|
REMARKS
|
1
|
CURRENT OPERATOR OF TOTAL E & P NIGERIA LIMITED CALL-OFF CONTRACT FOR OFFSHORE BARGE POSITIONING AT OML 99/100/102
|
TOTAL E & P NIGERIA LIMITED
|
JULY 2012 – JUNE 2017
|
2
|
CURRENT OPERATOR OF NIGERIAN AGIP OIL CO. LTD LAND & SWAMP SURVEY (TWO (2) YEARS RUNNING CONTRACT)
|
NIG. AGIP OIL CO. LTD (NAOC)
|
FEB. 2005 – JUNE 2017
|
3
|
BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)
|
PROJECT MASTERS FOR MOBIL UNLTD
|
OCT 2007 – TILL DATE
|
4
|
PRE-INSTALLATION MARINE SURVEY (ADJACENT TO NEFS/OEFS VIA 3D SONAR)
|
TECHNIXS OILFIELD SUPPORT LIMITED
|
JANUARY 2017
|
5
|
OSO – QIT GAS PIPELINE INSTALLATION PROJECT: PRELAY GEOPHYSICAL & GEOTECHNICAL SURVEY
|
WEST AFRICAN VENTURES (WAV)
|
OCTOBER – NOVEMBER 2016
|
6
|
WARIBOKO BARGE MOVE FROM OFD5 TO OFD3
|
TOTAL E & P NIGERIA LIMITED
|
OCTOBER 2016
|
7
|
WARIBOKO BARGE MOVE FROM OFQ TO OFD5 & OFD5 WELL SLOT POSITION VERIFICATION
|
TOTAL E & P NIGERIA LIMITED
|
JULY 2016
|
8
|
FULL PREPARATION SURVEY OF A SECTION IDU TO OB/OB PIPELINE R.O.W
|
NIG. AGIP OIL CO. LTD (NAOC)
|
JULY 2016
|
9
|
WARIBOKO BARGE MOVE FROM ODUDU OPEN WATER TO OFQ PLATFORM
|
TOTAL E & P NIGERIA LIMITED
|
MAY 2016
|
10
|
LB WHISKY STAR XIII POSITION FROM ETIM_LA PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
MAY – JUNE 2016
|
11
|
PHC MAIN BASE OFFICE SURFACE / UNDERGROUND FACILITY SURVEY
|
TOTAL E & P NIGERIA LIMITED
|
JAN – MAY 2016
|
12
|
LB WHISKY STAR XIII POSITION AT ETIM_LB PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
APRIL 2016
|
13
|
LB WHISKY STAR XIII POSITION AT ETIM_LB PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
APRIL 2016
|
14
|
LB WHISKY STAR XIII POSITION AT USARI FC PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
JANUARY 2016
|
15
|
LB TAMUNO ISELEGHA POSITION AT UBIT GP PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
DECEMBER 2015 –
JAN 2016
|
16
|
LB TAMUNO ISELEGHA POSITION AT UBIT GP PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
NOVEMBER - DECEMBER 2015
|
17
|
WHISKY STAR XIII POSITION AT ENANG E
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
DECEMBER 2015
|
18
|
WHISKY STAR XIII POSITION AT ETIM LA
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
NOVEMBER 2015
|
19
|
MAINTENANCE AND UPGRADE OF NPDC GIS WORKSTATION
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
JUNE – JULY 2015
|
20
|
POSITIONING OF WHISKY STAR XIII AT OSO RH PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
MAY, 2015
|
21
|
POSITIONING OF WHISKY STAR XIII AT UBIT GD PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
APRIL, 2015
|
22
|
POSITIONING OF WHISKY STAR XIII AT UBIT GK PLATFORM
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
MARCH, 2015
|
23
|
BARGE MOVE AND MOORING OF WARIBOKO (OTTO 5) FROM OFD1 TO OFQ OML 102 & JASCON 8 FROM OFON OPEN WATERS (OML 102) TO AMENAM FIELD (OML 99)
|
TOTAL E & P NIGERIA LIMITED
|
FEB-MAR, 2015
|
24
|
DEBRIS SURVEY AROUND UBIT GE PLATFORM
|
MOBIL PRODUCING UNLTD
|
JANUARY, 2015
|
25
|
DEBRIS SURVEY AROUND UBIT GG PLATFORM
|
MOBIL PRODUCING UNLTD
|
JANUARY, 2015
|
26
|
Pre-Lay/Pre-Engineering Survey Of Proposed 12’’ 60 Km Oil Pipeline from Okoro Wellhead Platform #2 OML-112 to PLEM at Ima Oil Terminal
OML-99
|
WEST AFRICAN VENTURES (WAV)
|
DECEMBER 2014 – JANUARY 2015
|
27
|
DEBRIS SURVEY AROUND EDOP P PLATFORM
|
MOBIL PRODUCING UNLTD
|
DECEMBER, 2014
|
28
|
BARGE MOVE AND MOORING OF BEAU GESTE FROM OFON OPEN WATER – OML 102 TO OFON OFD_2 PLATFORM – OML 102
|
TOTAL E & P NIGERIA LIMITED
|
NOVEMBER,2014
|
29
|
BARGE MOVE, DEMOORING AND MOORING OF OTTO 5 FROM OFON OPEN WATER – OML 102
|
TOTAL E & P NIGERIA LIMITED
|
OCTOBER,2014
|
30
|
BARGE MOVE AND MOORING OF JASCON 8 FROM OFON OPEN WATER –OML 102 TO AMENAM OPEN WATER – OML 99
|
TOTAL E & P NIGERIA LIMITED
|
SEPTEMBER, 2014
|
31
|
POSITIONING ON LB FUGAR
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
SEPTEMBER, 2014
|
32
|
BARGE MOVE AND MOORING OF JASCON 8 FROM AMENAM OPEN WATER – OML 99 TO OFON OPEN WATER – OML 102
|
TOTAL E & P NIGERIA LIMITED
|
JULY, 2014
|
33
|
BARGE MOVE AND UNMOORING OF BEAU GESTE FROM AMD-2 AMENAM OML 99
|
TOTAL E & P NIGERIA LIMITED
|
JUNE, 2014
|
34
|
DEBRIS SURVEY AROUND MFEM DB AND ETIM LB & LP PLATFORMS
|
MOBIL PRODUCING UNLTD
|
JUNE, 2014
|
35
|
POSITIONING ON LB FUGAR
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
APRIL-MAY, 2014
|
36
|
BARGE MOVE AND MOORING OF AWB BEAU GESTE FROM OFON OPEN WATERS – OML 102 TO AMENAM AMD-2 – OML 99 OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
MAR – APRIL 2014
|
37
|
DEBRIS SURVEY AROUND EKPE-OA PLATFORM
EKPE FIELD-OML 70- OFFSHORE NIGERIA
|
MOBIL PRODUCING UNLTD
|
FEB-MARCH 2014
|
38
|
POSITIONING ON LB FUGAR
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
FEB-MARCH 2014
|
39
|
BARGE MOVE AND MOORING (POSITIONING) OF AWB OTTO 5 FROM OFD-1 TO OPEN SEA OFON FIELD-OML 102- OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
FEBRUARY, 2014
|
40
|
POSITIONING OF OTTO 5 BARGE AT OFON OFD-1
OFON FIELD-OML 102- OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
JANUARY 2014
|
41
|
ACQUISITION OF NPDC GEOGRAPHIC INFORMATION (GIS) WORKSTATION
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
MAY – NOVEMBER, 2013
|
42
|
WELL FIX OF OGBOINBIRI 2, OGBOINBIRI DEEP 2 AND DETERMINATION OF RIG ROTARY TABLE ELEVATION
|
(NIGERIA AGIP OIL COMPANY LIMITED
|
NOVEMBER 2013
|
43
|
PRELIMINARY INVESTIGATION AND FULL PREPARATION SURVEY OF OZA WELL 1 TO OZA WELL 4 AND 2 TO ISIMIRI FLOWSTATION OPTIONS A AND B
|
MILLENIUM OIL & GAS COMPANY LIMITED (MOGCL)
|
SEPTEMBER 2013
|
44
|
PRE-DREDGE SOUNDING OF (AZUZUAMA 2,3,4,5 AND G LOCATIONS) WELL CONFIRMATION, WELL FIX AND CONTROL EXTENSION AT (AZUZUAMA MANIFOLD, AZUZUAMA 2,3,4,5 AND G LOCATIONS)
|
NIG. AGIP OIL CO. LTD.
|
AUGUST 2013
|
45
|
AS-BUILT SURVEY OF 24” OGODA TO BRASS TERMINAL PIPELINE ROW
|
.NIGERIA AGIP OIL COMPANY LTD.
|
AUGUST 2013
|
46
|
AS-BUILT SURVEY OF 36” BRASS TERMINAL TO BOP PIPLELINE ROW
|
NIGERIA AGIP OIL COMPANY LTD
|
AUGUST 2013
|
47
|
AS-BUILT SURVEY OF 12” AGBARA TO BRASS TERMINAL PIPELINE ROW
|
NIGERIA AGIP OIL COMPANY LTD
|
AUGUST 2013
|
48
|
CO-ORDINATE CONFIRMATION OF BRASS XSV 01, OBAMA XSV 02 AND ESTABLIHSMENT OF BRASS XSV 1A, XSV1B AND XSVD. WITNESS PILLARS.
|
NIGERIA AGIP OIL COMPANY LTD
|
AUGUST 2013
|
49
|
AS-BUILT SURVEY OF 24” BRASS RIVER MANIFOLD AND 4” OBAMA FLOW STATION TO BRASS TERMINAL GAS LINE ROW.
|
NIGERIA AGIP OIL COMPANY LTD
|
AUGUST 2013
|
50
|
DEBRIS SURVEY AROUND USARI FA PLATFORM
|
MOBIL PRODUCING UNLTD
|
AUGUST 2013
|
51
|
HYDROGRAPHIC SURVEY OF JONES CREEK FIELD LOCATIONS
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
JULY 2013
|
52
|
Hydrographic Survey Of The Proposed Locations For Ibaka Deep Sea Port Project
|
LASER IMAGERIES NIG. LTD FOR FELAK CONCEPT LTD, FCT, ABUJA
|
May-June 2013
|
53
|
FULL PREPARATION SURVEY OF PROPOSED EPF LOCATION
|
MILLENIUM OIL AND GAS COMPANY LIMITED
|
MAY 2013
|
54
|
FINAL REPORT OF SONAR SCAN SURVEY OF OSO RK AND RH PLATFORM OFFSHORE NIGERIA
|
MOBIL PRODUCING UNLTD
|
APRIL, 2013
|
55
|
HYDROGRAPHIC SURVEY OF OPUAMA FIELD RIVER ACCESS AND LOCATIONS
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
APRIL 2013
|
56
|
HYDROGRAPHIC SURVEY OF AGIP BASE JETTY
|
NIGERIA AGIP OIL COMPANY
|
APRIL 2013
|
57
|
PRE-DREDGE SOUNDING OF AZUZUAMA 1 LOCTION AND ACCESS
|
NIGERIA AGIP OIL COMPANY.
|
APRIL 2013
|
58
|
GPS CONTROL ESTABLISHMENT AND WELL FIX AT TINPA 1 AND 2 LOCATION
|
NIG. AGIP OIL CO. LTD
|
MARCH 2013
|
59
|
FINAL POSITIONING OF JASCON-8 BARGE AT AMENAM AMD2 PLATFORM OM L 99 OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
MARCH 2013
|
60
|
HYDROGRAPHIC SURVEY OF ODIDI FIELD LOCATIONS
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
FEBRUARY 2013
|
61
|
POSITIONING OF OTTO-5BARGE AT OFON OFD1 PLATFORM OML 102 OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
JANUAERY,2013
|
62
|
CONFIRMATION OF ETIM B SLOTS COORDINATES
|
MOBIL PRODUCING UNLTD
|
DECEMBER, 2012
|
63
|
BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
OCT/NOV., 2012
|
64
|
BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)
|
ASSOCIATED GAS FOR MOBIL UNLTD
|
SEPT/OCT., 2012
|
65
|
BARGE POSITIONING BEAU GESTE AT AMENAM FREE WATERS AMENAM FIELD OFFSHORE NIGERIA
|
TOTAL E & P NIGERIA LIMITED
|
SEPTEMBER, 2012
|
66
|
CONFIRMATION OF OYOT SLOTS COORDINATES
|
MOBIL PRODUCING UNLTD
|
SEPTEMBER, 2012
|
67
|
CONFIRMATION OF ABANG SLOTS COORDINATES
|
MOBIL PRODUCING UNLTD
|
JULY 2012
|
68
|
DEBRIS SURVEY OF UBIT GY
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
JULY 2012
|
69
|
DEBRIS SURVEY OF INANGA-A
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
JULY 2012
|
70
|
BOUNDARY RE-OPENING SURVEY OF PIPELINE ROW FROM OGBOINBIRI F/S TO OBAMA F/S
|
NIG. AGIP OIL CO. LTD (NAOC)
|
MAY - JUNE 2012
|
71
|
CO-ORDINATE CONFIRMATION OF ASHAKA 3 L&S, 4 L&S CELLAT PIT
|
NIG. AGIP OIL CO. LTD (NAOC)
|
MAY 2012
|
72
|
HYDROGRAPHIC SURVEY OF RIVER BENUE, FROM LOKOJA TO MAKURDI (240KM)
|
ALLOTT (NIGERIA) LIMITED
|
|
73
|
DEBRIS SURVEY OF USARI FR
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
MARCH 2012
|
74
|
PI/FP SURVEY OF TINPA-A LOCATION FLOWLINE (ROW) TO CLOUGH CREEK FLOWSTATION
|
NIG. AGIP OIL CO. LTD (NAOC)
|
MARCH 2012
|
75
|
BATHYMETRIC SURVEY OF ORASHI RIVER (DEGEMA – OGUTA LAKE – 205KM)
|
NATIONAL INLAND WATERWAYS AUTHORITY
|
NOVEMBER 2011
|
76
|
DEBRIS SURVEY OF ETIM LP
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
NOVEMBER 2011
|
77
|
SEABED SURVEY OF UBIT GO
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
OCTOBER 2011
|
78
|
SEABED SURVEY OF INIM PP
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
SEPTEMBER 2011
|
79
|
SEABED SURVEY OF UBIT GK
|
PROJECT MASTER FOR MOBIL UNLTD
|
AUGUST 2011
|
80
|
DEBRIS SURVEY OF OSO RB, RD, RE AND RH
|
GLOBESTAR ENGR. LTD FOR MOBIL UNLTD
|
JUNE 2011
|
81
|
HYDROGRAPHIC SURVEY OF RIVER BENUE, FROM LOKOJA TO MAKURDI (240KM)
|
ALLOTT (NIGERIA) LIMITED
|
APRIL 2011
|
82
|
DEBRIS SURVEY AROUND ETIM LP PLATFORM
|
MICHARRY COMPANY NIGERIA LIMITED
|
APRIL 2011
|
83
|
RIG-MOVE SURVEY OF UNAM CD
|
PROJECT MASTER FOR MOBIL UNLTD
|
APRIL 2011
|
84
|
DEBRIS SURVEY AROUND IYAK A AND UBIT GG PLATFORMS
|
PROJECT MASTER FOR MOBIL UNLTD
|
FEBRUARY 2011
|
85
|
DEBRIS SURVEY AROUND EDOP PLATFORM
|
PROJECT MASTER FOR MOBIL UNLTD
|
JANUARY 2011
|
86
|
DEBRIS SURVEY AROUND USARI FC PLATFORM
|
PROJECT MASTER FOR MOBIL UNLTD
|
DECEMBER 2010
|
87
|
P I. AND F. P SURVEY OF PROPOSED 6” PIPELINE ROUTE
FROM OZIEGBE FLOW STATION TO KOKO PORT
|
PAN OCEAN OIL CORPORATION NIGERIA
|
NOVEMBER 2010
|
88
|
DEBRIS SURVEY AROUND OSO RB, OSO RD, OSO RE, OSO RH, OSO RX, INIM PP, UBIT GY AND USARI FR PLATFORMS
|
PROJECT MASTER FOR MOBIL UNLTD
|
NOVEMBER 2010
|
89
|
HYDROGRAPHIC SURVEY OF LOT 5 OF THE LOWER RIVER NIGER DREDGING PROJECT, FROM BARO TO JAMATA BRIDGE (80KM)
|
NATIONAL INLAND WATERWAYS AUTHORITY
|
JULY 2010
|
90
|
DEBRIS SURVEY AROUND UBIT GG, GK, GJ, USARI FR AND IDOHO PLATFORMS
|
PROJECT MASTER FOR MOBIL UNLTD
|
JULY 2010
|
91
|
DEBRIS SURVEY AROUND USARI FA PLATFORM
|
PROJECT MASTER FOR MOBIL UNLTD
|
JUNE 2010
|
92
|
DEBRIS SURVEY AROUND UBIT GB PLATFORM
|
PROJECT MASTER FOR MOBIL UNLTD
|
APRIL 2010
|
93
|
FULL PREPARATION SURVEY OF PROPOSED AMUKPE TO ESCRAVOS MANIFOLD TERMINAL PIPE –LINE (SECTIONS 4 & 5)
|
PAN OCEAN OIL CORPORATION NIGERIA
|
APRIL 2010
|
94
|
DEBRIS SURVEY AROUND ENANG E PLATFORM
|
PROJECT MASTER FOR MOBIL UNLTD
|
OCTOBER 2009
|
95
|
SITE SURVEY AROUND AWODI WEST 1 LOCATION
|
TETRA PETROLEUM OILFIELD SERVICES (NIG) LTD
|
SEPTEMBER, 2009
|
96
|
SEABED SURVEY OF BC AND CC CAISON LOCATIONS
|
SHEBAH EXPLORATION & PRODUCTION COMPANY LTD
|
SEPTEMBER, 2009
|
97
|
DEBRIS SURVEY AROUND USARI FR, OSO RX AND OSO RE PLATFORMS
|
PROJECT MASTER FOR MOBIL UNLTD
|
AUGUST 2009
|
98
|
DEBRIS SURVEY AROUND INIM PP AND ETIM LP PLATFORMS
|
PROJECT MASTER FOR MOBIL UNLTD
|
MAY 2009
|
99
|
BARGE AND ANCHOR POSITIONING
|
HERCULES FOR MOBIL UNLTD
|
MAR 2009 – MAR 2010
|
100
|
ROW SURVEY OF OZA/ISIMIRI/OKOLOMA
|
MILLENIUM OIL & GAS CO. LTD
|
DEC. 2008 – 2011
|
101
|
BARGE AND ANCHOR POSITIONING
|
SUDELETTRA NIGERIA LTD FOR ELF
|
NOV. 2008 – JANUARY 2009
|
102
|
FULL PREPARATION SURVEY FOR THE PROPOSED NAG WELL DRILLING LOCATION AT EGBEMA WEST LOCATION
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
APRIL 2008 – MAY 2008
|
103
|
BARGE AND ANCHOR POSITIONING DURING HEAVY LIFT OPERATIONS
|
DAMAS OIL FOR ADDAX PETROLEUM
|
AUG – DEC 2008
|
104
|
BARGE POSITIONING FOR PIPE CLAMPING PROJECT (VIKING FORCADOS)
|
OMAK MARITIME FOR MOBIL UNLTD
|
JULY 2008 – MAY 2009
|
105
|
BARGE AND ANCHOR POSITIONING DURING HEAVY LIFT OPERATIONS
|
DAMAS OIL FOR ADDAX PETROLEUM
|
NOV 2007 – APR 2008
|
106
|
VIBROCORE GEOTECHNICAL TESTIONG OF SOIL FOR OVER 11M DEPTH OF NOTORE CHANNEL ONNE RIVERS STATE -
|
NOTORE FOR NPA
|
MARCH, 2007
|
107
|
SIDE SCAN/MAGNETOMETER (HAZARD) SURVEY OF NOTORE CHANNEL ONNE RIVERS STATE.
|
NOTORE FOR NPA
|
MARCH, 2007
|
108
|
SURVEY OF CALABAR GAS PIPELINES (R.O.W.) ROUTES (HAZARD SURVEY - OFFSHORE SEGMENT) - 43Km
|
NIGER DELTA POWER HOLDING
|
Nov. 2006
|
109
|
PRELIMINARY INVESTIGATION SURVEYS IN SWAMP LOCATIONS ( AROH & OGHAREKI FIELDS) OML -49 NPDC/CHEVRON/JV
|
NIGERIAN PETROLEUM DEVELOPMENT CO.
|
Oct 2006
|
110
|
PERIMETER BOUNDARY OF THE PROPOSED BY-PASS AND FAMILY PARCELS & SURVEY OF NEW LAND EXTENSION (10x411m) AND IBEWA 4 ACCESS (10x560m)
|
TOTAL NIGERIA
|
Oct. 2006
|
111
|
ROUTE SURVEY OF OMOTOSHO GAS PIPELINE R.O.W.
|
GC LIMITED
|
MAY 2006
|
112
|
PRELIMINARY INVESTIGATION SURVEY OF BISENI CLUSTER 4, 5, AND 6 LOCATIONS AT BISENI
|
NAOC
|
MAR. 2006
|
113
|
ANCHOR POSITIONING SERVICES (BARGE MANAGEMENT) AT UKPOKITI FIELD OFFSHORE NIGER DELTA
|
SHEBAH EXPLORATION & PRODUCTION COMPANY LTD
|
FEB – JULY, 2006
|
114
|
FULL PREPERATION SURVEY OF TEBIDABA “EAST – A” FLOWLINE R.O.W. – NAOC
|
NAOC
|
FEB. - MAR. 2006
|
115
|
BOUNDARY RE-ESTABLISHMENT OF AGIP LOCATIONS AT OMOKU, OBIAFU, OBRIKOM, EBOCHA, EBEGORO, MGBEDE, AND AKIR
|
NAOC
|
JAN. 2006
|
116
|
EXTENSION - SURVEY OF ROAD A & B OML 58 UPGRADE PACKAGE
|
TOTAL NIGERIA
|
DEC 2005
|
117
|
PRELIMINARY INVESTIGATION SURVEY OF TEBIDABA “EAST – A” FLOWLINE R.O.W
|
NAOC
|
NOV. 2005
|
118
|
DEBRIS SEARCH SURVEY AT TOTALFINAELF FIELD, CAMEROON
|
LOCATECH SERVICES / TOTALFINAELF.
|
NOV. 2005
|
119
|
CLOUGH CREEK MAPPING AND AS BUILT SURVEY OF CLOUGH CREEK FLOWSTATION
|
NAOC
|
OCT 2005
|
120
|
SURVEY OF ROAD A & B OML 58 UPGRADE PACKAGE
|
TOTAL NIGERIA
|
SEPT. 2005
|
121
|
HAZARD SURVEYS AT UPOKITI FIELD
|
SHEBAH EXPLORATION & PRODUCTION COMPANY LTD
|
AUGUST 2005
|
122
|
AS-BUILT SURVEY OF 6” PIPELINE OKAN-02 TO OKAN-21, 6” PIPELINE OKAN-09 TO OKAN-21, 6” PIPELINE OKAN-PP TO OKAN-61, 8” PIPELINE OKAN-PP TO DS-47, 6” PIPELINE MEJI-RP TO MEJI-B, 8” PIPELINE MEJI-RP TO MEJI-B, 6” PIPELINE MEJI-RP TO MEJI-43, 6” PIPELINE MEREN-1 TO MEREN-4
|
WILBROS FOR CHEVRON/TEXACO
|
JUNE, 2005
|
123
|
POSITIONING OF BARGES FOR PIPE LAYING, PLATFORM INSTALLATION AND MAINTENANCE.
|
WILBROS FOR VARIOUS OIL CO.
|
APRIL 2004 TO 2005
|
124
|
POSITIONING FOR DIVING SUPPORTVESSEL, SHALLOW WATER PIPELINE AND PLATFORM MAINTENANCE
|
WILBROS FOR VARIOUS OIL CO.
|
APRIL 2004 TO 2005
|
125
|
FULL SPREAD SURVEY OF ADOP QP – ASASA VA PLATFORM (PRE ENGINEERING SURVEY)
|
WILBROS
FOR MOBIL
|
JAN. 2005
|
126
|
SSS SURVEY OF SHORE APPROACH OF PROPOSED PIPELINE TO AMINAM FIELD
|
STOLT OFFSHORE/ GLOBAL ENG. CO. LTD
|
DEC, 2004
|
127
|
SIDE SCAN SONAR AND BATHYMETRIC SURVEY IN THE BONNY AREA
|
TP INTER SERV
|
NOV, 2004
|
128
|
ROUTE SURVEY OF EREMA – ITUOGBA
|
TOTAL – ELF
|
NOV, 2004
|
129
|
AS BUILT SURVEY OF UBETA FIELD
|
TOTAL - ELF
|
SEPT, 2004
|
130
|
EXTENSION OF GEODETIC CONTROL TO UBETA FIELD FOR CO-ORDINATES HARMONISATION
|
TOTAL – ELF
|
SEPT. 2004
|
131
|
MAGNETOMETER SURVEY FOR MOBIL AT OSO FIELD
|
GEODETIC OFFSHORE SERV. LTD
|
JULY, 2004
|
132
|
CO-RDINATES HARMONISATION FROM OB76 – OB 91 LOCATION
|
TOTAL – ELF
|
JUNE 2004
|
133
|
MAGNETOMETER SURVEY OF EBNE – ADRP PIPELINE IN ADDAX FIELD
|
WILBROS
FOR ADDAX
|
MAY 2004
|
134
|
LAYOUT SURVEY OF ORO – EKE ROYAL FAMILY LAND AT ILOM, WOJI TOWN, PORT – HARCOURT. RIVERS STATE (126 PLOTS)
|
ORO – EKE ROYAL FAMILY
|
MAY 2004
|
135
|
CO-ORDINATES EXTENSION FROM OGBOGU TO AMA FIELD
|
TOTAL – ELF
|
FEB. 2004
|
136
|
DEBRIS SURVEY OF AGBARA FIELD
|
ORWELL CO
FOR SAIPEN 2000
|
JAN. 2004
|
137
|
SIDE SCAN SONAR SURVEY OF THE SHORE APPROACH AND CP SURVEY OF IDOHO TO QIT & OSOG TO BRT PIPELINES
|
PINL MARINE & OIL SERVICES FOR MOBIL
|
OCT./NOV 2003
|
138
|
SSS & MAGI SURVEY OF NLNG PIPELINE CROSSING (BONNY AND NEW CALABAR RIVERS)
|
INTERSITE
FOR NLNG
|
SEPT. 2003
|
139
|
BATHYMETRIC AND DEBRIS SEARCH OF BONNY AND NEW CALABAR RIVER GAS LINE CROSSING
|
INTERSITE CO LTD
|
SEPT. 2003
|
140
|
HARBOR WRECK SURVEY LAGOS
|
TP INTER. SERVICES
|
AUGUST 2003
|
141
|
OFFSHORE SITE SURVEY ON BEHALF OF MULTINATIONAL GEOSCIENCE LTD.
|
CHEVRON NIGERIA LIMITED
|
JUNE/JULY 2003
|
142
|
LAYOUT SURVEY OF OGBONDA EJEKWU VILLAGE AT OHIA NVUIGWE, WOJI TOWN, PORT – HARCOURT. RIVERS STATE (65 PLOTS)
|
OGBONDA FAMILY
|
MARCH 2003
|
143
|
OML 58 CO-ORDINATES HARMONISATION SURVEY – OBAGI FIELD PHASE 3
|
ELF
|
MARCH 2003
|
144
|
OML 57 CO-ORDINATES HARMONISATION OF ALL LOCATIONS AND FLOWLINES IN AGHIGHO FIELDS
|
ELF
|
NOV. DEC 2002
|
145
|
AS-BUILT SURVEY OF EXISTING PLANT, LAND AND BATHYMETRIC SURVEY OF BONNY TERMINAL.
|
HYUNDAI (SPDC EAST)
|
MAY – AUG 2002
|
146
|
AS-BUILT SURVEY OF IDU FLOW STATION
|
NAOC
|
MAY 2002
|
147
|
FULL PREPARATION SURVEY AND AS-BUILT SURVEY OF OGBAINBIRI – TEBIDABA GAS LINE (32 KM)
|
NAOC
|
FEB-MARCH 2002
|
148
|
ENGINEERING SETTING OUT SURVEY (AFAM POWER STATION)
|
SILVERBALL
|
MARCH – AUGT 2001
|
149
|
AS-BUILT SURVEY OF ROW PILLARS FOR EKULAMA AGG P/L PROJECT
|
NISSCO
|
NOV 2000
|
150
|
PI & FP SURVEY OF OPUKUSHI – TUNU TRUNK LINE (22KM)
|
SPDC WEST
|
OCT-NOV 2000
|
151
|
AS-BUILT SURVEY OF NLNG WATER WELL ROAD BONNY ISLAND
|
NLNG
|
SEPT-OCT 2000
|
152
|
PI & FP SURVEY OF OGBAINBIRI – AJATITON P/LINE (16KM)
|
SPDC WEST
|
APRIL 2000
|
153
|
BOUNDARY RE-OPENING OF OGBAINBIRI FIELD
|
SPDC WEST
|
APRIL 2000
|
154
|
DETAIL SURVEY OF NEMBE GIRLS SEC.SCH.
|
SPDC EAST
|
APRIL 2000
|
155
|
AS-BUILT SURVEY OF BOMU-BONNY P/LINE (16KM)
|
SPDC EAST
|
APRIL 2000
|
156
|
PRE-DREDGING SURVEY (SOUNDING) OF AGHIGHO LOC SLOTS
|
ELF
|
MARCH 2000
|
157
|
AS-BUILT SURVEY OF BONNY WELL 10 & 12 F/LINE
|
SPDC EAST
|
MARCH 2000
|
158
|
AS-BUILT SURVEY OF ATLAS COVE LAGOS
|
WILBROS
|
JAN/FEB 2000
|
159
|
PIPE DETECTION OF ALAKIRI FLOWLINES
|
HAMDREDGING
|
JAN 2000
|
160
|
SIEBOU FLOWLINE ROUTE SURVEY (9KM)
|
SPDC WEST
|
APRIL 1999
|
161
|
107 PLOTS LAYOUT SURVEY, UGBO – ETCHE RD PH
|
J. UTCHAY
|
AUG. 98
|
162
|
SUPPLY OF OFFSHORE SURVEYORS (CALL ON CALL OFF)
|
ZENITH
|
JUNE 99 – DATE
|
163
|
SUPPLY OF OFFSHORE SURVEYORS (CALL ON CALL OFF)
|
FUGRO
|
MAR 98 – 2004
|
164
|
P.I. &FP SURVEY OF SEIBO WELL B, D & K (3.3KM)
|
SPDC WEST
|
SEP 98
|
165
|
P.I. SURVEY OF AGG 8” BATAN ALTERNATIVE ROUTE (5.3KM).
|
SPDC WEST
|
APRIL 98
|
166
|
AS-BUILT & REGIONAL SURVEY OF AGG 8” BATAN D/L. (2.4KM )
|
SPDC WEST
|
APRIL–SEPT 98
|
167
|
AS-BUILT & REGIONAL SURVEY OF AGG 20” RAPELE-FORCADOS T/L (6.5KM LENGHT)
|
SPDC WEST
|
APRIL–SEPT 98
|
168
|
AS-BUILT & REGIONAL SURVEY OF AGG 16” JONES CREEK – KEREMO T/L (8.2KM LENGHT)
|
SPDC WEST
|
APRIL –SEPT 98
|
169
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-11 D/L. (4.2KM)
|
SPDC WEST
|
APRIL –SEPT 98
|
170
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODID1-1 F/S TO DIDI-1 WELL-8 F/L. (3.5KM LENGHT)
|
SPDC WEST
|
APRIL –SEPT 98
|
171
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODIDI 11 D/L. (1.2KM )
|
SPDC WEST
|
APRIL –SEPT 98
|
172
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODID1 D/L.(1.2KM
|
SPDC WEST
|
APRIL –SEPT 98
|
173
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-11 D/L. (4.2KM)
|
SPDC WEST
|
APRIL –SEPT 98
|
174
|
FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-1 D/L. (1.2KM))
|
SPDC WEST
|
APRIL –SEPT 98
|
175
|
ROUTE SURVEY OF 8” BELEMA-EKULAMA G/LINE 12.6KM.
|
SPDC EAST
|
DEC97-JAN 98
|
176
|
DETAIL SURVEY OFOKPUKUSHI WELLS 4, 19, & 21 AND AJATITON – 1A LOCATIONS.
|
SPDC WEST
|
OCT-NOV 98
|
177
|
P.I. & FP SURVEY OF SEIBO –C LOCATION (2.2KM)
|
SPDC WEST
|
JULY 98
|
178
|
AS-BUILT SURVEY OF OBIGBO NORTH F/S EXT.
|
SPDC EAST
|
OCT. 97
|
179
|
5 SEISMIC SURVEY CREWS KOLO CREEK PROSPECT
|
GECO-PRAKLA
|
96-NOV 97
|
180
|
FP SURVEY OF SOKU CLUSTER – A FLSRE LINE
|
SPDC EAST
|
APRIL 97
|
181
|
P.I. SURVEY OF OKOROBA – B LOCATION (2.7)
|
SPDC EAST
|
MARCH 97
|
182
|
P.I. SURVEY OF OKO ROBA – A LOCATION (2.5)
|
SPDC EAST
|
MARCK 97
|
183
|
FP SURVEY OF OKORBA HELIPAD
|
SPDC EAST
|
MARCH 97
|
184
|
3 SSEISMIC SURVEY CREWS, OKOROBA PROSPECT.
|
GECO-PRAKLA
|
NOV 96-JUN 97
|
185
|
P.I. SURVEY OF 8 “ ODEAMA – BELEMA G/LINE.15KM
|
SPDC EAST
|
DEC 96/JAN 97
|
186
|
AS-BUILT SURVEY OF ODEMA F/S
|
SPDC EAST
|
DEC. 96
|
187
|
AS-BUILT SURVEY OF IGIRAKIRI COMMUNITY
|
SPDC EAST
|
OCT. 96
|
188
|
SATELITE CONFIRMATION OF LOCATED WELLS (USING GPS) 14 PTS.
|
NAOC EAST
|
SEPT. 96
|
189
|
AS-BUILT SURVEY OF ALAKIRI GAS PLANT
|
SPDC EAST
|
AUG. 96
|
190
|
AS-BUILT SURVEY OF 4” APARA F/S-AGIP NEW BASE (5.1KM)
|
NAOC EAST
|
JULY. 96
|
191
|
TERRESTIAL CONFIRMATION OF GPS PTS. (30 STNS)
|
SPDC WEST
|
JUL-SEPT. 96
|
192
|
P. I. SURVEY OF AWOBA LOCATION (2.4KM)
|
SPDC EAST
|
APRIL 96
|
193
|
ENVIRONMETAL/BLOCKADE SURVEY OF PEREMABIRI COMMUNITY
|
SPDC EAST
|
MAR.96
|