The company has been in operation since 1996 and has successfully completed satisfactory jobs for many of its clients both in Oil and and non-oil industry. Some of these jobs are shown below:

S/N

PROJECTS

CLEINT

REMARKS

1

CURRENT OPERATOR OF TOTAL E & P NIGERIA LIMITED CALL-OFF CONTRACT FOR OFFSHORE BARGE POSITIONING AT OML 99/100/102

 TOTAL E & P NIGERIA LIMITED

JULY 2012 – JUNE 2017

2

CURRENT OPERATOR OF NIGERIAN AGIP OIL CO. LTD LAND & SWAMP SURVEY (TWO (2) YEARS RUNNING CONTRACT)

NIG. AGIP OIL CO. LTD (NAOC)

FEB. 2005 – JUNE 2017

3

BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)

PROJECT MASTERS FOR MOBIL UNLTD

OCT 2007 – TILL DATE

4

PRE-INSTALLATION MARINE SURVEY (ADJACENT TO NEFS/OEFS VIA 3D SONAR)

 

TECHNIXS OILFIELD SUPPORT LIMITED

 

JANUARY 2017

5

OSO – QIT GAS PIPELINE INSTALLATION PROJECT: PRELAY GEOPHYSICAL & GEOTECHNICAL SURVEY

WEST AFRICAN VENTURES (WAV)

OCTOBER – NOVEMBER 2016

6

WARIBOKO BARGE MOVE FROM OFD5 TO OFD3

 

TOTAL E & P NIGERIA LIMITED

OCTOBER 2016

7

WARIBOKO BARGE MOVE FROM OFQ TO OFD5 & OFD5 WELL SLOT POSITION VERIFICATION

TOTAL E & P NIGERIA LIMITED

JULY 2016

8

FULL PREPARATION SURVEY OF A SECTION IDU TO OB/OB PIPELINE R.O.W

NIG. AGIP OIL CO. LTD (NAOC)

JULY 2016

9

WARIBOKO BARGE MOVE FROM ODUDU OPEN WATER TO OFQ PLATFORM

 

TOTAL E & P NIGERIA LIMITED

MAY 2016

10

LB WHISKY STAR XIII POSITION FROM ETIM_LA PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

MAY – JUNE 2016

11

PHC MAIN BASE OFFICE SURFACE / UNDERGROUND FACILITY SURVEY

TOTAL E & P NIGERIA LIMITED

JAN – MAY 2016

12

LB WHISKY STAR XIII POSITION AT ETIM_LB PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

APRIL 2016

13

LB WHISKY STAR XIII POSITION AT ETIM_LB PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

APRIL 2016

14

LB WHISKY STAR XIII POSITION AT USARI FC PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

JANUARY 2016

15

LB TAMUNO ISELEGHA POSITION AT UBIT GP PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

DECEMBER 2015 –

JAN 2016

16

LB TAMUNO ISELEGHA POSITION AT UBIT GP PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

NOVEMBER - DECEMBER 2015

17

WHISKY STAR XIII POSITION AT ENANG E

 

ASSOCIATED GAS FOR MOBIL UNLTD

DECEMBER 2015

18

WHISKY STAR XIII POSITION AT ETIM LA

 

ASSOCIATED GAS FOR MOBIL UNLTD

NOVEMBER 2015

19

MAINTENANCE AND UPGRADE OF NPDC GIS WORKSTATION

NIGERIAN PETROLEUM DEVELOPMENT CO.

JUNE – JULY 2015

20

POSITIONING OF WHISKY STAR XIII AT OSO RH PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

MAY, 2015

21

POSITIONING OF WHISKY STAR XIII AT UBIT GD PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

APRIL, 2015

22

POSITIONING OF WHISKY STAR XIII AT UBIT GK PLATFORM

ASSOCIATED GAS FOR MOBIL UNLTD

MARCH, 2015

23

BARGE MOVE AND MOORING OF WARIBOKO (OTTO 5) FROM OFD1 TO OFQ OML 102 & JASCON 8 FROM OFON OPEN WATERS (OML 102) TO AMENAM FIELD (OML 99)

 TOTAL E & P NIGERIA LIMITED

FEB-MAR, 2015

24

DEBRIS SURVEY AROUND UBIT GE PLATFORM

 

 MOBIL PRODUCING UNLTD

JANUARY, 2015

25

DEBRIS SURVEY AROUND UBIT GG PLATFORM

 

 MOBIL PRODUCING UNLTD

JANUARY, 2015

26

Pre-Lay/Pre-Engineering Survey Of Proposed 12’’ 60 Km Oil Pipeline from Okoro Wellhead Platform #2 OML-112 to PLEM at Ima Oil Terminal

OML-99

WEST AFRICAN VENTURES (WAV)

DECEMBER 2014 – JANUARY 2015

27

DEBRIS SURVEY AROUND EDOP P PLATFORM

 

MOBIL PRODUCING UNLTD

DECEMBER, 2014

28

BARGE MOVE AND MOORING OF BEAU GESTE FROM OFON OPEN WATER – OML 102 TO OFON OFD_2 PLATFORM – OML 102

 TOTAL E & P NIGERIA LIMITED

NOVEMBER,2014

29

BARGE MOVE, DEMOORING AND MOORING OF OTTO 5 FROM OFON OPEN WATER – OML 102

 TOTAL E & P NIGERIA LIMITED

OCTOBER,2014

30

BARGE MOVE AND MOORING OF JASCON 8 FROM OFON OPEN WATER –OML 102 TO AMENAM OPEN WATER – OML 99

TOTAL E & P NIGERIA LIMITED

SEPTEMBER, 2014

31

POSITIONING ON LB FUGAR

ASSOCIATED GAS FOR MOBIL UNLTD

SEPTEMBER, 2014

32

BARGE MOVE AND MOORING OF JASCON 8 FROM AMENAM OPEN WATER – OML 99 TO OFON OPEN WATER – OML 102

TOTAL E & P NIGERIA LIMITED

JULY, 2014

33

BARGE MOVE AND UNMOORING OF BEAU GESTE FROM AMD-2 AMENAM OML 99

TOTAL E & P NIGERIA LIMITED

JUNE, 2014

34

DEBRIS SURVEY AROUND MFEM DB AND ETIM LB & LP PLATFORMS

 

MOBIL PRODUCING UNLTD

JUNE, 2014

35

POSITIONING ON LB FUGAR

ASSOCIATED GAS FOR MOBIL UNLTD

APRIL-MAY, 2014

36

BARGE MOVE AND MOORING OF AWB BEAU GESTE FROM OFON OPEN WATERS – OML 102 TO AMENAM AMD-2 – OML 99 OFFSHORE NIGERIA

 TOTAL E & P NIGERIA LIMITED

MAR – APRIL 2014

37

DEBRIS SURVEY AROUND EKPE-OA PLATFORM

EKPE FIELD-OML 70- OFFSHORE NIGERIA

 MOBIL PRODUCING UNLTD

FEB-MARCH 2014

38

POSITIONING ON LB FUGAR

ASSOCIATED GAS FOR MOBIL UNLTD

FEB-MARCH 2014

39

BARGE MOVE AND MOORING (POSITIONING) OF AWB OTTO 5 FROM OFD-1 TO OPEN SEA OFON FIELD-OML 102- OFFSHORE NIGERIA

TOTAL E & P NIGERIA LIMITED

FEBRUARY, 2014

40

POSITIONING OF OTTO 5 BARGE AT OFON OFD-1

OFON FIELD-OML 102- OFFSHORE NIGERIA

 TOTAL E & P NIGERIA LIMITED

JANUARY 2014

41

ACQUISITION OF NPDC GEOGRAPHIC INFORMATION (GIS) WORKSTATION

NIGERIAN PETROLEUM DEVELOPMENT CO.

MAY – NOVEMBER, 2013

42

WELL FIX OF OGBOINBIRI 2, OGBOINBIRI DEEP 2 AND DETERMINATION OF RIG ROTARY TABLE ELEVATION

(NIGERIA AGIP OIL COMPANY LIMITED

NOVEMBER 2013

43

PRELIMINARY INVESTIGATION AND FULL PREPARATION SURVEY OF OZA WELL 1 TO OZA WELL 4 AND 2 TO ISIMIRI FLOWSTATION OPTIONS A AND B

MILLENIUM OIL & GAS COMPANY LIMITED (MOGCL)

SEPTEMBER 2013

44

PRE-DREDGE SOUNDING OF (AZUZUAMA 2,3,4,5 AND G LOCATIONS) WELL CONFIRMATION, WELL FIX AND CONTROL EXTENSION AT (AZUZUAMA MANIFOLD, AZUZUAMA 2,3,4,5 AND G LOCATIONS)

NIG. AGIP OIL CO. LTD.

AUGUST 2013

45

AS-BUILT SURVEY OF 24” OGODA TO BRASS TERMINAL PIPELINE ROW

.NIGERIA AGIP OIL COMPANY LTD.

AUGUST 2013

46

AS-BUILT SURVEY OF 36” BRASS TERMINAL TO BOP PIPLELINE ROW

NIGERIA AGIP OIL COMPANY LTD

AUGUST 2013

47

AS-BUILT SURVEY OF 12” AGBARA TO BRASS TERMINAL PIPELINE ROW

NIGERIA AGIP OIL COMPANY LTD

AUGUST 2013

48

CO-ORDINATE CONFIRMATION OF BRASS XSV 01, OBAMA XSV 02 AND ESTABLIHSMENT OF BRASS XSV 1A, XSV1B AND XSVD. WITNESS PILLARS.

NIGERIA AGIP OIL COMPANY LTD

AUGUST 2013

49

AS-BUILT SURVEY OF 24” BRASS RIVER MANIFOLD AND 4” OBAMA FLOW STATION TO BRASS TERMINAL GAS LINE ROW.

NIGERIA AGIP OIL COMPANY LTD

AUGUST 2013

50

DEBRIS SURVEY AROUND USARI FA PLATFORM

 MOBIL PRODUCING UNLTD

AUGUST 2013

51

HYDROGRAPHIC SURVEY OF JONES CREEK FIELD LOCATIONS

NIGERIAN PETROLEUM DEVELOPMENT CO.

JULY 2013

52

Hydrographic Survey Of The Proposed Locations For Ibaka Deep Sea Port Project

LASER IMAGERIES NIG. LTD FOR FELAK CONCEPT LTD, FCT, ABUJA

May-June 2013

53

FULL PREPARATION SURVEY OF PROPOSED EPF LOCATION

MILLENIUM OIL AND GAS COMPANY LIMITED

MAY 2013

54

FINAL REPORT OF SONAR SCAN SURVEY OF OSO RK AND RH PLATFORM OFFSHORE NIGERIA

MOBIL PRODUCING UNLTD

APRIL, 2013

55

HYDROGRAPHIC SURVEY OF OPUAMA FIELD RIVER ACCESS AND LOCATIONS

NIGERIAN PETROLEUM DEVELOPMENT CO.

APRIL 2013

56

HYDROGRAPHIC SURVEY OF AGIP BASE JETTY

NIGERIA AGIP OIL COMPANY

APRIL 2013

 

57

PRE-DREDGE SOUNDING OF AZUZUAMA 1 LOCTION AND ACCESS

NIGERIA AGIP OIL COMPANY.

APRIL 2013

58

GPS CONTROL ESTABLISHMENT AND WELL FIX AT TINPA 1 AND 2 LOCATION

NIG. AGIP OIL CO. LTD

MARCH 2013

59

FINAL POSITIONING OF JASCON-8 BARGE AT AMENAM AMD2 PLATFORM OM L 99 OFFSHORE NIGERIA

 TOTAL E & P NIGERIA LIMITED

MARCH 2013

60

HYDROGRAPHIC SURVEY OF ODIDI FIELD LOCATIONS

NIGERIAN PETROLEUM DEVELOPMENT CO.

FEBRUARY 2013

61

POSITIONING OF OTTO-5BARGE AT OFON OFD1 PLATFORM OML 102 OFFSHORE NIGERIA

 TOTAL E & P NIGERIA LIMITED

JANUAERY,2013

62

CONFIRMATION OF ETIM B SLOTS COORDINATES

MOBIL PRODUCING UNLTD

DECEMBER, 2012

63

BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)

ASSOCIATED GAS FOR MOBIL UNLTD

OCT/NOV., 2012

64

BARGE POSITIONING FOR OFFSHORE CONSTRUCTION AND INSTALLATION PROGRAM (OCIP)

ASSOCIATED GAS FOR MOBIL UNLTD

SEPT/OCT., 2012

65

BARGE POSITIONING BEAU GESTE AT AMENAM FREE WATERS AMENAM FIELD OFFSHORE NIGERIA

 TOTAL E & P NIGERIA LIMITED

SEPTEMBER, 2012

66

CONFIRMATION OF OYOT SLOTS COORDINATES

MOBIL PRODUCING UNLTD

SEPTEMBER, 2012

67

CONFIRMATION OF ABANG SLOTS COORDINATES

 

MOBIL PRODUCING UNLTD

JULY 2012

68

DEBRIS SURVEY OF UBIT GY

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

JULY 2012

69

DEBRIS SURVEY OF INANGA-A

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

JULY 2012

70

BOUNDARY RE-OPENING SURVEY OF PIPELINE ROW FROM OGBOINBIRI F/S TO OBAMA F/S

NIG. AGIP OIL CO. LTD (NAOC)

MAY - JUNE 2012

71

CO-ORDINATE CONFIRMATION OF ASHAKA 3 L&S, 4 L&S CELLAT PIT

NIG. AGIP OIL CO. LTD (NAOC)

MAY 2012

72

HYDROGRAPHIC SURVEY OF RIVER BENUE, FROM LOKOJA TO MAKURDI (240KM)

ALLOTT (NIGERIA) LIMITED

 

73

DEBRIS SURVEY OF USARI FR

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

MARCH 2012

74

PI/FP SURVEY OF TINPA-A LOCATION FLOWLINE (ROW) TO CLOUGH CREEK FLOWSTATION

NIG. AGIP OIL CO. LTD (NAOC)

MARCH 2012

75

BATHYMETRIC SURVEY OF ORASHI RIVER (DEGEMA – OGUTA LAKE – 205KM)

NATIONAL INLAND WATERWAYS AUTHORITY

NOVEMBER 2011

76

DEBRIS SURVEY OF ETIM LP

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

NOVEMBER 2011

77

SEABED SURVEY OF UBIT GO

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

OCTOBER 2011

78

SEABED SURVEY OF INIM PP

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

SEPTEMBER 2011

79

SEABED SURVEY OF UBIT GK

 

PROJECT MASTER        FOR MOBIL UNLTD

AUGUST 2011

80

DEBRIS SURVEY OF OSO RB, RD, RE AND RH

 

GLOBESTAR ENGR. LTD FOR MOBIL UNLTD

JUNE 2011

81

HYDROGRAPHIC SURVEY OF RIVER BENUE, FROM LOKOJA TO MAKURDI (240KM)

ALLOTT (NIGERIA) LIMITED

APRIL 2011

82

DEBRIS SURVEY AROUND ETIM LP PLATFORM

MICHARRY COMPANY NIGERIA LIMITED

APRIL 2011

83

RIG-MOVE SURVEY OF UNAM CD

 

PROJECT MASTER        FOR MOBIL UNLTD

APRIL 2011

84

DEBRIS SURVEY AROUND IYAK A AND UBIT GG PLATFORMS

 PROJECT MASTER        FOR MOBIL UNLTD

FEBRUARY 2011

85

DEBRIS SURVEY AROUND EDOP PLATFORM

 

PROJECT MASTER        FOR MOBIL UNLTD

JANUARY 2011

86

DEBRIS SURVEY AROUND USARI FC PLATFORM

 PROJECT MASTER        FOR MOBIL UNLTD

DECEMBER 2010

87

P I. AND F. P SURVEY OF PROPOSED 6” PIPELINE ROUTE

FROM OZIEGBE FLOW STATION TO KOKO PORT

PAN OCEAN OIL CORPORATION NIGERIA

NOVEMBER 2010

88

DEBRIS SURVEY AROUND OSO RB, OSO RD, OSO RE, OSO RH, OSO RX, INIM PP, UBIT GY AND USARI FR PLATFORMS

PROJECT MASTER FOR MOBIL UNLTD

NOVEMBER 2010

89

HYDROGRAPHIC SURVEY OF LOT 5 OF THE LOWER RIVER NIGER DREDGING PROJECT, FROM BARO TO JAMATA BRIDGE (80KM)

NATIONAL INLAND WATERWAYS AUTHORITY

JULY 2010

90

DEBRIS SURVEY AROUND UBIT GG, GK, GJ, USARI FR AND IDOHO PLATFORMS

 

PROJECT MASTER FOR MOBIL UNLTD

JULY 2010

91

DEBRIS SURVEY AROUND USARI FA PLATFORM

 

PROJECT MASTER FOR MOBIL UNLTD

JUNE 2010

92

DEBRIS SURVEY AROUND UBIT GB PLATFORM

PROJECT MASTER FOR MOBIL UNLTD

APRIL 2010

93

FULL PREPARATION SURVEY OF PROPOSED AMUKPE TO ESCRAVOS MANIFOLD TERMINAL PIPE –LINE (SECTIONS 4 & 5)

 

PAN OCEAN OIL CORPORATION NIGERIA

 

APRIL 2010

94

DEBRIS SURVEY AROUND ENANG E PLATFORM

 

PROJECT MASTER FOR MOBIL UNLTD

OCTOBER 2009

95

SITE SURVEY AROUND AWODI WEST 1 LOCATION

TETRA PETROLEUM    OILFIELD SERVICES (NIG) LTD

SEPTEMBER, 2009

96

SEABED SURVEY OF BC AND CC CAISON LOCATIONS

 

SHEBAH EXPLORATION & PRODUCTION COMPANY LTD

SEPTEMBER, 2009

97

DEBRIS SURVEY AROUND USARI FR, OSO RX AND OSO RE PLATFORMS

 

PROJECT MASTER FOR MOBIL UNLTD

AUGUST 2009

98

DEBRIS SURVEY AROUND INIM PP AND ETIM LP PLATFORMS

PROJECT MASTER FOR MOBIL UNLTD

MAY 2009

99

BARGE AND ANCHOR POSITIONING

HERCULES FOR MOBIL UNLTD

MAR 2009 – MAR 2010

100

ROW SURVEY OF OZA/ISIMIRI/OKOLOMA

MILLENIUM OIL & GAS CO. LTD

DEC. 2008 – 2011

101

BARGE AND ANCHOR POSITIONING

SUDELETTRA NIGERIA LTD FOR ELF

NOV. 2008 – JANUARY 2009

102

FULL PREPARATION SURVEY FOR THE PROPOSED NAG WELL DRILLING LOCATION AT EGBEMA WEST LOCATION

NIGERIAN PETROLEUM DEVELOPMENT CO.

APRIL 2008 – MAY 2008

 

103

BARGE AND ANCHOR POSITIONING DURING HEAVY LIFT OPERATIONS

DAMAS OIL FOR ADDAX PETROLEUM

AUG – DEC 2008

104

BARGE POSITIONING FOR PIPE CLAMPING PROJECT (VIKING FORCADOS)

OMAK MARITIME FOR MOBIL UNLTD

JULY 2008 – MAY 2009

105

BARGE AND ANCHOR POSITIONING DURING HEAVY LIFT OPERATIONS

DAMAS OIL FOR ADDAX PETROLEUM

NOV 2007 – APR 2008

106

VIBROCORE GEOTECHNICAL TESTIONG OF SOIL FOR OVER 11M DEPTH OF NOTORE CHANNEL ONNE RIVERS STATE -

NOTORE FOR NPA

MARCH, 2007

107

SIDE SCAN/MAGNETOMETER (HAZARD) SURVEY OF NOTORE CHANNEL ONNE RIVERS STATE.

NOTORE FOR NPA

MARCH, 2007

108

SURVEY OF CALABAR GAS PIPELINES (R.O.W.) ROUTES  (HAZARD SURVEY - OFFSHORE SEGMENT)  - 43Km

NIGER DELTA POWER HOLDING

Nov. 2006

109

PRELIMINARY INVESTIGATION SURVEYS IN SWAMP LOCATIONS ( AROH & OGHAREKI FIELDS) OML -49 NPDC/CHEVRON/JV

 

NIGERIAN PETROLEUM DEVELOPMENT CO.

Oct 2006

110

PERIMETER BOUNDARY OF THE PROPOSED BY-PASS AND FAMILY PARCELS & SURVEY OF NEW LAND EXTENSION (10x411m) AND IBEWA 4 ACCESS (10x560m)

TOTAL NIGERIA

Oct. 2006

111

ROUTE SURVEY OF OMOTOSHO GAS PIPELINE R.O.W.

 

GC LIMITED

MAY 2006

112

PRELIMINARY INVESTIGATION SURVEY OF BISENI CLUSTER 4, 5, AND 6 LOCATIONS AT BISENI

NAOC

MAR. 2006

113

ANCHOR POSITIONING SERVICES (BARGE MANAGEMENT) AT UKPOKITI FIELD OFFSHORE NIGER DELTA

 

SHEBAH EXPLORATION & PRODUCTION COMPANY LTD

FEB – JULY, 2006

114

FULL PREPERATION SURVEY OF TEBIDABA “EAST – A” FLOWLINE R.O.W. – NAOC

NAOC

FEB. - MAR. 2006

115

BOUNDARY RE-ESTABLISHMENT OF AGIP LOCATIONS AT OMOKU, OBIAFU, OBRIKOM, EBOCHA, EBEGORO, MGBEDE, AND AKIR

NAOC

JAN. 2006

116

EXTENSION - SURVEY OF ROAD A & B OML 58 UPGRADE PACKAGE

TOTAL NIGERIA

DEC 2005

117

PRELIMINARY INVESTIGATION SURVEY OF TEBIDABA “EAST – A” FLOWLINE R.O.W

NAOC

NOV. 2005

118

DEBRIS SEARCH SURVEY AT TOTALFINAELF FIELD, CAMEROON

 

 LOCATECH SERVICES / TOTALFINAELF.

NOV. 2005

119

CLOUGH CREEK MAPPING AND AS BUILT SURVEY OF CLOUGH CREEK FLOWSTATION

  NAOC

OCT 2005

120

SURVEY OF ROAD A & B OML 58 UPGRADE PACKAGE

TOTAL NIGERIA

SEPT. 2005

121

HAZARD SURVEYS AT UPOKITI FIELD

SHEBAH EXPLORATION & PRODUCTION COMPANY LTD

AUGUST 2005

122

AS-BUILT SURVEY OF 6” PIPELINE OKAN-02 TO OKAN-21, 6” PIPELINE OKAN-09 TO OKAN-21, 6” PIPELINE OKAN-PP TO OKAN-61, 8” PIPELINE OKAN-PP TO DS-47, 6” PIPELINE MEJI-RP TO MEJI-B, 8” PIPELINE MEJI-RP TO MEJI-B, 6” PIPELINE MEJI-RP TO MEJI-43, 6” PIPELINE MEREN-1 TO MEREN-4

WILBROS FOR CHEVRON/TEXACO

JUNE, 2005

123

POSITIONING OF BARGES FOR PIPE LAYING, PLATFORM INSTALLATION AND MAINTENANCE.

WILBROS FOR VARIOUS OIL CO.

APRIL 2004 TO 2005

124

POSITIONING FOR DIVING SUPPORTVESSEL, SHALLOW WATER PIPELINE AND PLATFORM MAINTENANCE

WILBROS FOR VARIOUS OIL CO.

APRIL 2004 TO 2005

125

FULL SPREAD SURVEY OF ADOP QP – ASASA VA PLATFORM (PRE ENGINEERING SURVEY)

WILBROS

FOR MOBIL

JAN. 2005

126

SSS SURVEY OF SHORE APPROACH OF PROPOSED PIPELINE TO AMINAM FIELD

STOLT OFFSHORE/ GLOBAL ENG. CO. LTD

DEC, 2004

127

SIDE SCAN SONAR AND BATHYMETRIC SURVEY IN THE BONNY AREA

TP INTER SERV

NOV, 2004

128

ROUTE SURVEY OF EREMA – ITUOGBA

TOTAL – ELF

NOV, 2004

129

AS BUILT SURVEY OF UBETA FIELD

TOTAL - ELF

SEPT, 2004

130

EXTENSION OF GEODETIC CONTROL TO UBETA FIELD FOR CO-ORDINATES HARMONISATION

TOTAL – ELF

SEPT. 2004

131

MAGNETOMETER SURVEY FOR MOBIL AT OSO FIELD

GEODETIC OFFSHORE  SERV. LTD

JULY, 2004

132

CO-RDINATES HARMONISATION FROM OB76 – OB 91 LOCATION

TOTAL – ELF

JUNE 2004

133

MAGNETOMETER SURVEY OF EBNE – ADRP PIPELINE IN ADDAX FIELD

WILBROS

FOR ADDAX

MAY 2004

134

LAYOUT SURVEY OF ORO – EKE ROYAL FAMILY LAND AT ILOM, WOJI TOWN, PORT – HARCOURT. RIVERS STATE  (126 PLOTS)

ORO – EKE ROYAL FAMILY

MAY 2004

135

CO-ORDINATES EXTENSION FROM OGBOGU TO AMA FIELD

TOTAL – ELF

FEB. 2004

136

DEBRIS SURVEY OF AGBARA FIELD

ORWELL CO

FOR SAIPEN 2000

JAN. 2004

137

SIDE SCAN SONAR SURVEY OF THE SHORE APPROACH AND CP SURVEY OF IDOHO TO QIT & OSOG TO BRT PIPELINES

PINL MARINE & OIL SERVICES FOR MOBIL

OCT./NOV 2003

138

SSS & MAGI SURVEY OF NLNG PIPELINE CROSSING (BONNY AND NEW CALABAR RIVERS)

INTERSITE

FOR NLNG

SEPT. 2003

139

BATHYMETRIC AND DEBRIS SEARCH OF BONNY AND NEW CALABAR RIVER GAS LINE CROSSING

INTERSITE CO LTD

SEPT. 2003

140

HARBOR WRECK SURVEY LAGOS

TP INTER. SERVICES

AUGUST 2003

141

OFFSHORE SITE SURVEY ON BEHALF OF MULTINATIONAL GEOSCIENCE LTD.

CHEVRON NIGERIA LIMITED

JUNE/JULY 2003

142

LAYOUT SURVEY OF OGBONDA EJEKWU VILLAGE AT OHIA NVUIGWE, WOJI TOWN, PORT – HARCOURT. RIVERS STATE (65 PLOTS)

OGBONDA FAMILY

MARCH 2003

143

OML 58 CO-ORDINATES HARMONISATION SURVEY – OBAGI FIELD PHASE 3

ELF

MARCH 2003

144

OML 57 CO-ORDINATES HARMONISATION OF ALL LOCATIONS AND FLOWLINES IN AGHIGHO FIELDS

ELF

NOV. DEC 2002

145

AS-BUILT SURVEY OF EXISTING PLANT, LAND AND BATHYMETRIC SURVEY OF BONNY TERMINAL.

HYUNDAI (SPDC EAST)

MAY – AUG 2002

 

146

AS-BUILT SURVEY OF IDU FLOW STATION

NAOC

MAY 2002

147

FULL PREPARATION SURVEY AND AS-BUILT SURVEY OF OGBAINBIRI – TEBIDABA GAS LINE (32 KM)

NAOC

FEB-MARCH 2002

148

ENGINEERING SETTING OUT SURVEY (AFAM POWER STATION)

SILVERBALL

MARCH – AUGT 2001

149

AS-BUILT SURVEY OF ROW PILLARS FOR EKULAMA AGG P/L PROJECT

NISSCO

NOV 2000

150

PI & FP SURVEY OF OPUKUSHI – TUNU TRUNK LINE (22KM)

SPDC WEST

OCT-NOV 2000

151

AS-BUILT SURVEY OF NLNG WATER WELL ROAD BONNY ISLAND

NLNG

SEPT-OCT 2000

152

PI & FP SURVEY OF OGBAINBIRI – AJATITON P/LINE (16KM)

SPDC WEST

APRIL 2000

153

BOUNDARY RE-OPENING OF OGBAINBIRI FIELD

SPDC WEST

APRIL 2000

154

DETAIL SURVEY OF NEMBE GIRLS SEC.SCH.

SPDC EAST

APRIL 2000

155

AS-BUILT SURVEY OF BOMU-BONNY P/LINE (16KM)

SPDC EAST

APRIL 2000

156

PRE-DREDGING SURVEY (SOUNDING) OF AGHIGHO LOC SLOTS

ELF

MARCH 2000

157

AS-BUILT SURVEY OF BONNY WELL 10 & 12 F/LINE

SPDC EAST

MARCH 2000

158

AS-BUILT SURVEY OF ATLAS COVE LAGOS

WILBROS

JAN/FEB 2000

159

PIPE DETECTION OF ALAKIRI FLOWLINES

HAMDREDGING

JAN 2000

160

SIEBOU FLOWLINE ROUTE SURVEY (9KM)

SPDC WEST

APRIL 1999

161

107 PLOTS LAYOUT SURVEY, UGBO – ETCHE RD PH

J. UTCHAY

AUG. 98

162

SUPPLY OF OFFSHORE SURVEYORS (CALL ON CALL OFF)

ZENITH

JUNE  99 – DATE

163

SUPPLY OF OFFSHORE SURVEYORS (CALL ON CALL OFF)

FUGRO

MAR 98 – 2004

164

P.I. &FP SURVEY OF SEIBO WELL B, D & K (3.3KM)

SPDC WEST

SEP 98

165

P.I. SURVEY OF AGG 8” BATAN ALTERNATIVE ROUTE (5.3KM).

SPDC WEST

APRIL 98

166

AS-BUILT & REGIONAL SURVEY OF AGG 8” BATAN D/L. (2.4KM )

SPDC WEST

APRIL–SEPT 98

167

AS-BUILT & REGIONAL SURVEY OF AGG 20” RAPELE-FORCADOS T/L (6.5KM LENGHT)

SPDC WEST

APRIL–SEPT 98

168

AS-BUILT & REGIONAL SURVEY OF AGG 16” JONES CREEK – KEREMO T/L (8.2KM LENGHT)

SPDC WEST

APRIL –SEPT 98

169

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-11 D/L. (4.2KM)

SPDC WEST

APRIL –SEPT 98

170

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODID1-1 F/S TO DIDI-1 WELL-8 F/L. (3.5KM LENGHT)

SPDC WEST

APRIL –SEPT 98

171

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODIDI 11 D/L. (1.2KM )

SPDC WEST

APRIL –SEPT 98

172

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” ODID1 D/L.(1.2KM

SPDC WEST

APRIL –SEPT 98

173

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-11 D/L. (4.2KM)

SPDC WEST

APRIL –SEPT 98

174

FP, AS-BUILT & REGIONAL SURVEY OF AGG 8” EGWA-1 D/L. (1.2KM))

SPDC WEST

APRIL –SEPT 98

175

ROUTE SURVEY OF 8” BELEMA-EKULAMA G/LINE 12.6KM.

SPDC EAST

DEC97-JAN 98

176

DETAIL SURVEY OFOKPUKUSHI WELLS 4, 19, & 21 AND AJATITON – 1A LOCATIONS.

SPDC WEST

OCT-NOV 98

177

P.I. & FP SURVEY OF SEIBO –C LOCATION (2.2KM)

SPDC WEST

JULY 98

178

AS-BUILT SURVEY OF OBIGBO NORTH F/S EXT.

SPDC EAST

OCT. 97

179

5 SEISMIC SURVEY CREWS KOLO CREEK PROSPECT

GECO-PRAKLA

96-NOV 97

180

FP SURVEY OF SOKU CLUSTER – A FLSRE LINE

SPDC EAST

APRIL 97

181

P.I. SURVEY OF OKOROBA – B LOCATION (2.7)

SPDC EAST

MARCH 97

182

P.I. SURVEY OF OKO ROBA – A LOCATION (2.5)

SPDC EAST

MARCK 97

183

FP SURVEY OF OKORBA HELIPAD

SPDC EAST

MARCH 97

184

3 SSEISMIC SURVEY CREWS, OKOROBA PROSPECT.

GECO-PRAKLA

NOV 96-JUN 97

185

P.I. SURVEY OF 8 “ ODEAMA – BELEMA G/LINE.15KM

SPDC EAST

DEC 96/JAN 97

186

AS-BUILT SURVEY OF ODEMA F/S

SPDC EAST

DEC. 96

187

AS-BUILT SURVEY OF IGIRAKIRI COMMUNITY

SPDC EAST

OCT. 96

188

SATELITE CONFIRMATION OF LOCATED WELLS (USING GPS) 14 PTS.

NAOC EAST

SEPT. 96

189

AS-BUILT SURVEY OF ALAKIRI GAS PLANT

SPDC EAST

AUG. 96

190

AS-BUILT SURVEY OF 4” APARA F/S-AGIP NEW BASE (5.1KM)

NAOC EAST

JULY. 96

191

TERRESTIAL CONFIRMATION OF GPS PTS. (30 STNS)

SPDC WEST

JUL-SEPT. 96

192

P. I. SURVEY OF AWOBA LOCATION (2.4KM)

SPDC EAST

APRIL 96

 193

ENVIRONMETAL/BLOCKADE SURVEY OF PEREMABIRI COMMUNITY

SPDC EAST